Faced with rising costs, General Electric is moving production of its new energy-efficient water heater halfway around the world. The country it’s leaving? China. The one it’s bringing 400 jobs and a newly renovated factory? The United States.
A small but growing band of U.S. manufacturers — including giants such as General Electric (GE), NCR (NCR) and Caterpillar (CAT) — are turning the seemingly inexorable offshoring movement on its head, bringing some production to the U.S. from far-flung locations such as China. Others that were buying components overseas are switching to U.S. suppliers.
CALL FOR A QUOTE
(510) 580-8500
OR EMAIL:
Sales@Sonicmfg.com
Copyright © 2021 sonicmfg.com. All Rights Reserved. | Site Map | Privacy Policy
Silicon Valley,CA| Salt Lake City,UT|Sacramento,CA
47951 Westinghouse Drive
Fremont, CA 94539
Headquartered in Fremont, California, Sonic provides in-house board design, prototyping and New Product Introduction (NPI) through full production in as little as five to ten days.